| Service name | Unit | Unit price, KZT (excl. VAT) | Effective period |
|---|---|---|---|
| Electricity Transmission | kWh | 0,432 | 01.03.2025 – 28.02.2026 |
| 0,438 | 01.03.2026 – 28.02.2027 | ||
| Potable Water Supply | m³ | 488,66 | from 01.07.2025 |
| Industrial Water Supply | m³ | 127,17 | 01.07.2025 |
| 138,62 | 01.10.2026 | ||
| Wastewater Disposal | m³ | 195,23 | 01.08.2025 |
| Railway Siding Provision for Rolling Stock Passage | wagon/km | 91,94 | from 01.05.2025 |
| 114,37 | from 01.01.2027 | ||
| Railway Siding Provision for Shunting, Loading/Unloading, Other Transport Operations and Rolling Stock Standing | wagon/hour | 173,83 | from 01.05.2025 |
| 216,53 | from 01.01.2027 | ||
| Transmission, Distribution and Supply of Thermal Energy in Hot Water | Gcal | 3 199,15 | 01.10.2025 – 31.05.2026 |
| 3 885,37 | 01.06.2026 – 30.09.2026 | ||
| 4 014,56 | 01.10.2026 – 30.09.2027 | ||
| Transmission, Distribution and Supply of Thermal Energy in Steam 16 kg/cm² | Gcal | 10 482,68 | 01.10.2025 – 31.05.2026 |
| 12 655,49 | 01.06.2026 – 30.09.2026 | ||
| 13 200,45 | 01.10.2026 – 30.09.2027 | ||
| Transmission, Distribution and Supply of Thermal Energy in Steam 40 kg/cm² | Gcal | 12 504,85 | 01.10.2025 – 31.05.2026 |
| 14 136,38 | 01.06.2026 – 30.09.2026 | ||
| 14 566,94 | 01.10.2026 – 30.09.2027 |